SECOND STORY ADDITION
After the master bedroom remodel, the
homeowner decided in fall 2004 to add a second story addition.
As part of a seismic upgrade, Arts & Craftsmen was required
to dismantle and reassemble the master bedroom exactly as
it stood before.
A full basement
remodel on the same house is scheduled to be completed in
late 2005.
|